videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of

华泰水泥熟料生产线项目部

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterpriseimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implemethe village and \"no unauthorised\" created

监理工作总结

华泰水泥项目监理部

uded place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"cycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyher water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue o catch on, and resolve a split cannot be changed. All localities and departments to 30, 2017 Qian, all incls to energy conservation, rent the piers, algae and otvideoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of监理工作总结

华泰水泥熟料项目部在公司正确领导下,团结协作,诚信服务,奋勇拼搏,圆满地完成了华泰水泥熟料项目施工阶段的监理任务。 今就该项目的施工监理工作总结如下:

一、工程概况

本工程位于厂区南侧,由矿渣粉,熟料粉储存及散装,总高38m,

筑建面积1156m2有4个Φ15m钢筋混凝土浇筑而成,结构为钢筋混凝土;水泥储存及散装,总高38m,筑建面积1156m2有4个Φ15m钢筋混凝土浇筑而成,结构为钢筋混凝土;熟料库总高54.76m,有2Φ40m筒仓,建筑总面积2512m2,由钢筋混凝土和钢网架组合而成;水泥原料调配库三联体筒仓,钢筋混凝土结构;矿渣粉输送、场外输送、喂料楼、回料楼、热风制备、矿渣配料站均为混凝土框架结构;水泥磨:钢筋混凝土基础,建筑面积约800m2,建筑高度32.6m,钢筋混凝土框架结构,填充墙砌筑;矿渣磨基础:钢筋混凝土基础;包装车间,高度15.4m,框架、钢屋架组成。

二、参建单位

建设单位:长治县华泰水泥熟料有限公司 施工单位:山西宏图建设工程有限公司 勘察单位:山西第四勘察设计院

设计单位:陕西西安科技大学建筑设计研究院

四、监理过程情况 (一)、监理机构

监理部根据委托监理合同规定的监理范围和控制目标,并结合考虑监理人员的工作经验、专业水平等条件,实行总监理工程师负责制,由总监理工程师1名、监理工程师5名和监理员2名组建了一支监理队伍进驻现场开展监理工作。 1、监理工作制度

根据监理规划、监理细则的要求,监理部在总监理工程师主持下订立了监理例会制度、监理岗位责任制、旁站监理方案、见证取样方案,监理资料档案管理

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of制度多项规章制度,督促所有成员努力工作,为项目部尽职尽责。 (1)、各专业师及监理员每天按栋号负责巡检并填写《监理日记》。

(2)、各监理工程师或监理员每天对各栋号施工现场进行巡检、专项复检和验收,关键工序、关键部位全过程旁站监理。

(3)、每周一下午14:00由总监或总监代表组织召开工程例会,总结上周各施工单位工作计划完成情况,布置下周工作,协调解决工作中出现的矛盾和问题,并对突出的重点问题重点解决。

(4)、每月召开一次监理部内部例会,对工程质量、安全、进度、文明施工进行总结,对各方面表现突出的栋号监理负责人给予肯定和表扬,对出现问题的栋号监理负责人,进行分析、查找原因,并督促其及时解决改正。

(5)、每月由总监代表或总监组织编写监理月报,总结本月内各工号监理情况及现场施工状况,及时向项目部及公司汇报。

(6)、专人负责编制整理监理内业资料,项目部下发的工程文件,下发给施工单位的指令文件和施工单位上报的工程文件以及监理部与各方的来往函件,并形成收发文记录备查。

(7)、监理部在单位工程竣工验收后,在总监或总监代表主持下对每个标段的监理工作进行一次全面总结 2、项目监理部工作方法及原则

(1)、监理部进入施工现场后,以总监理工程师为首的监理部各监理工程师和监理员从工程建设项目实际出发,以贯彻、落实有关政策、严格履行《监理委托合同》、认真执行有关技术标准、规范和各项法规为原则,以建设质量高、投资合理、速度快的工程为控制目标,以“协作、诚信、开拓、进取”为行业标准,以事前指导、事中检查、事后验收等为工作方法,全面地开展监理工作。同时,在工作中,各监理工程师和监理员严格行使《监理委托合同》中赋予监理人员的权利,以精干的业务知识、实事求是的敬业精神、一丝不苟的科学态度和公正廉洁的工组作风从严依法监理,在工作中不断加强监理内部组织管理,积极探索总结工作经验,使监理工作真正体现出它的科学性、公正性。

(2)、在对项目部的服务方面,监理部在不超出监理合同规定的监理范围内全力满足项目部提出的要求,努力做好项目部的参谋和代理人。在对施工单位的管理方面,采取以管为主、以“监、帮、促”相结合的原则开展工作,同时督促施工单

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of位推行全面质量管理,促进工程建设管理水平不断迈向新台阶。 (二)工程质量控制

工程质量控制是本次履行监理合同的核心内容,也是监理部的主要工作目标。为此,监理部各监理工程师和监理员在总监理工程师的带领下从影响工程质量的几个主要因素入手,运用主动控制的方法,对各工号的施工质量采取事前、事中与事后控制,确保工程质量达到承包合同、设计文件及相关验收标准的要求。 1、对施工单位及施工人员的控制

施工单位进场后,首先对施工单位的企业资质以及营业范围入手开始进行审查,同时重点审查其管理人员及特殊工种作业人员的上岗资质,对其上岗执业资格予以确认;对专业分包单位的施工资质及其管理人员的上岗执业资格予以确认。

2、对原材料、构配件的质量控制

(1)、现场监理工程师和监理员严格对进场材料进行检验,对照材料样本,检查品牌、产地、厂家、规格大小,必须符合要求;材料报验必须具备产品合格证和检测报告,资料质量证明文件齐全。在检验过程中,发现不合格的材料立即退场更换,以确保进场材料符合质量要求。

(2)、工程监理过程中,监理工程师和监理员要求各施工单位进场材料必须附产品出厂合格证,并及时报监理工程师进行进场材料的外观检验和质量证明文件审查,对按要求需做二次复试的原材料及时进行见证取样,并送法定检测单位检测。对外观检验及质量保证资料均符合要求的材料方允许在工程上使用。对于外观检验和检测结果不合格的材料,要求承包单位立即清出现场,不得使用。同时在监理过程中对使用的材料采取跟踪监督,杜绝施工单位在使用材料时存在‘以次充好,偷梁换柱’的现象发生。

(3)、认真审核、填写《材料设备验收单》,做好《材料设备进场验收专项台帐》的记录整理。

3、施工方法、技术措施的质量控制

在控制施工单位的施工方法和技术措施方面,采取预控措施。在施工单位准备施工工程项目前,要求施工单必须提前上报经其上级主管部门业已审批的施工组织设计或施工技术措施;并经监理工程师、总监理工程师审查批准后,方允许施工单位依据其编制的施工组织设计或施工技术措施组织施工。对其提交的施工

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of组织设计或施工技术措施,着重审查其是否具有针对性、可操作性和对现场施工的指导性,并根据设计文件、规范以及现场实际情况提出相应的审查意见;对其内容中存在的编制错误或与设计文件、规范相违背的地方给予指正,要求其在修改后重新报审。在监理过程中,对施工单位各项技术措施及质量保证措施的落实情况进行监督检查。 (二)施工进度控制

1、 工程进度的快慢直接关系到工程建设项目能否按期竣工和投入使用问题。监理部结合现场实际情况,对施工单位编制的施工进度计划进行提前审查,经与项目部协商并征得同意,对施工单位不合理的工序安排提出意见,要求其合理调整,使进度计划满足实际工程需要。

2、现场监理过程中,监理部要求施工单位每月,每周提前编报《施工进度月计划》,《施工进度周计划》及劳动力安排计划提交审核后方可实施,把许多存在的工程问题放在事前进行考虑解决。同时,监理部监理工程师和监理员也积极协助,为施工单位创造有利条件;从而确保施工工序连续有序进行,确保施工进度按计划完成。 (三)投资控制

1、监理部按照施工合同、工程施工实际进度、工程质量对所监理的各项目进行工程款支付申请予以确认。 2 、认真审核〈〈现场签证单〉〉。 (四)对安全文明施工环境的控制

在环境控制方面,针对各工号的工程特点及其周边环境的特点,充分考虑施工中可能发生的情况,提前书面通知施工单位充分做好施工前准备工作,充分考虑生产环境、劳动环境、周边环境对施工的影响,避免工作准备不充分或保证措施、防护措施不利而影响正常施工进度或施工质量。严格按照施工现场文明规范,每月进行两次安全文明专项检查,杜决隐患,着重检查施工现场安全用电、文明施工和材料堆放及加工并做好记录整理。 (五)合同管理

现场监理过程中,受项目部委托,项目监理部根据施工现场相关合同的约定对工程工期、质量进行监督、管理;监督材料、设备合同的履行;掌握合同的副本,了解合同的内容,进行合同跟踪管理,检查合同执行情况,及时准确反映

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of合同信息。认真检查施工合同的履行情况,实现科学管理。根据监理合同的规定,在各工号具备竣工条件时,组织施工单位进行竣工初验,同时提出验收意见,形成书面材料。 (六)内业管理

在一般建设工程中,施工单位往往只重视施工现场的外业管理工作,而忽视了工程技术资料的管理,尤其是内业资料的同步管理工作。为此,项目监理部进驻施工现场后,对工程技术资料的管理提出了严格要求。

1、由监理人员下达给施工单位的开工、停工、返工等相关通知及报送项目部《备忘录》等文件,都是以书面形式由项目监理部签发,避免以往工程建设中的口头通知,后期难以核实而引起的不必要纠纷,真正把工程问题落实到书面上,使得现场监理人员能够有理有据地开展监理和审查工作。

2、现场的内业资料管理过程中,根据实际情况需要,监理部编制了实用性较强的监理资料表格,如:《现场检查记录》、《施工用电安全隐患专项检查记录》、《材料堆方及加工安全专项检查记录》等等,确保现场内业资料实现表格化,并实行文件随时发送、随时登记的制度,实现场所有文件都能做到系统管理。

五、验收结论

1、各分部、分项工程验收均合格。 2、安全及功能项目检测均符合设计要求。 3、质量控制资料齐全,完整。 4、观感质量验收合格。

六、监理工作小结

受华泰水泥熟料有限公司的委托,监理部于2010年7月20日进驻工程施工现场。进驻现场的监理部人员深感肩上责任的重大,近一年来,监理人员在现场监理过程中,始终秉着“协作、诚信、开拓、进取”的企业精神,贯彻执行“精心组织,规范监理,全面实现工程建设目标,竭诚服务,严格管理,不断总结,提高工作实效”的质量方针,最终促使监理合同范围内的所有工程均能一次性通过竣工验收。

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created videoconference, Secretary of the provincial Committee of Xia Baolong stressed: this year is the \"five water treatment\" \"357\" timetables \"for three years to resolve outstanding issues, obviously worked,\" victory of the year. The County's departments at all levels must firmly establish the \"guanghui is gold and silver\" green development concept, convinced that Castle is not relaxed, always maintaining strategic ability and strong determination to improve the environment, consistently playing well \"five water treatment of\" winning the war, ever-higher levels of comprehensive well-off society was built. (A) lay the sewage uphill battle. This year we will \"river water quality improved at the county level, up to five\" this basic objective grasp of pollution control that focus, with the focus on three things: a good job, \"clear rivers\" reaching the County created. Organization \"look back\" special inspection, the County garbage River, black and odorous River is \"Dragnet\" investigation, timelyrectification of problems found in place firmly to prevent river pollution rebound. In accordance with the \"one-stop strategy\ng the inferior five water quality monitoring stations work this year to ensure the Elimination of 1 provincial control, five water quality section 3 municipalities controlled deterioration, ensure the creation this year of \"clear rivers\" standards. Second, pay special attention to pollution-cutting construction of nanotubes. Intercepting nanotubes are the basis of pollution of water source engineering, engineering, matter of success or failure of water management. Urban sewage treatment, to improve \"effluent from sewage treatment rate, running accuracy, compliance\" requirement, speed up the town's support network construction, is focusing on nanotubes home \"last meters\" question. Domestic sewage treatment in rural areas, this year is the final year of the three-year action, determination to fight and the momentum around, ending the battle on which fully to ensure the realization of all County 648 formed village coverage. Also, be sure to attach importance to focus on rural domestic wastewater treatment facility operation and management, ensure that wastewater treatment facility up and running, role play, avoid the \"Sun\" problem. Third, pay special attention to the River Lake pond desilting operation. Provinces now have focused on pollution control of water go to \"dig up mud\s the deepening water of this year's \"plays\". Next, to jump-start an investigation line touches work, implementation plan according to the priorities and the programme of work, in accordance with the \"one river one policy\" requires detailed cleaning, dredging plan, planning ahead of time cleaning out mud \"way out\ng to local conditions to do sludge, promote scientific resource utilization of silt and mud. (B) the heavy regulation of heavily polluting industries. Pollution of water must grab the source, wastewater is primarily the source of backward production capacity, increase the intensity of该工程的一期工程于2012年3月30日正式通过集中交付验收、二期工程于2009年6月30日正式通过集中交付验收。至此,监理工作已按业主委托的《监理合同》全面完成。

下一阶段,监理部将依据项目部委托《监理合同》中约定的工程质量保修期的监理工作。在承担质量保修期监理工作时,监理部安排监理人员对业主提出的工程质量缺陷进行检查和记录,对施工单位进行修复的工程质量进行验收,合格后予以签认,同时对工程质量缺陷原因进行调查分析并确定责任归属,对非施工单位原因造成的工程缺陷,监理部予以现场证实,同时将实际情况及时上报项目部,确保工程质量保修工作的全面开展,圆满完成各项监理任务!

回顾近一年的现场监理工作,在公司领导的正确指引下,在项目总监理工程师的正确领导下,经过大家的共同努力,在华泰水泥熟料项目上,项目监理部的现场监理工作取得了一定的成效,同时在工程建设中发挥了较大的作用,总结监理工作成绩的取得,是和项目部的正确指挥与支持、理解分不开的。为此,以总监为首的监理部全体人员向项目部诸位领导及全体同仁的大力支持和帮助表示深深的谢意!

同时,监理部全体成员也深深地认识到,在华泰水泥熟料项目工程监理过程中,监理部的工作还存在一些问题以及很多亟需提高的地方。如:组织机构不健全;专业监理知识水平相对较低;对施工单位的监督和管理经验还不是很丰富;对施工现场的综合把控能力和对具体事件的处理技巧能力还不是很强。等等…。但是,随着后续项目的连续开发,监理部将会继续贯彻执公司的指导方针,进一步努力提高监理工作水平,增强监理综合实力,为创精品工程多献一份监理得力量。

reatment of heavily polluting industries. According to municipal, and municipal government deployment of seven big heavy pollution industry regulation \"three years action plans\o December 2016 end of Qian, all included shut stopped eliminated of enterprise all shut stopped eliminated in place; June 30, 2017 Qian, all included place regulation upgrade and agglomeration restructuring of enterprise by unified standard regulation in place, late not standard of enterprise are implementation discontinued; June 30, 2018 Qian, all intends Park production of enterprise relocation Park in place, late not Park of are discontinued. In the process of renovation, will focus on four aspects: to firmly close the high energy consumption and heavy pollution, hopeless enterprise governance and production lines, eliminated a number of yearly emission intensity, low value-added products of backward production capacity. Second, we must strictly enforce the space, total project \"Trinity\"environment access system, promoting industry access and environmental conditions of access of enterprises to the Park, industrial park, in principle, no longer the class on the new project. Thirdly, promoting replacement and reconstruction of heavily polluting industries, mergers and reorganizations, guide enterprises to energy conservation, recycling and low-carbon and clean production, and improve the level of green development. Four to establish a long-term supervision mechanism, increase the intensity of special inspections, investigate and punish the rectification is not in place, normal business of running anti-pollution installations do not. (Iii) linkage to promote flood control water, drainage, water supply, improving water saving. Speed up cross ang support river dike reinforcement, and along Pu seawall except insurance reinforcement, and Lake Qian sluice, and BA Cao sluice, and cloud cover reservoir, focus flood control drainage engineering construction, vigorouslyimplementation \"strong library\" \"solid di\" \"spread row\" engineering, increased geological disaster hidden points governance efforts, solid advance small basin torrent disaster governance, efforts from essentially solution basin sex, and regional flood control drainage capacity insufficient of problem. Vigorously implement the piers, algae and other water sources protection and, promoting rural drinking water safety projects, setting up water pricing reform and environmental protection mechanism, guiding water depth. Further soil pollution and repair, strengthen agricultural non-point source pollution prevention, mountain, water, forests, fields, lakes, various elements mutual long. Four, manage to tighten control, to play \"three to split\" battle. Xia Baolong, Secretary of provincial party Committee stressed that while the \"three to split\" operation time is over three years, but \"three to split\" must continue to catch on, and resolve a split cannot be changed. All localities and departments to the village and \"no unauthorised\" created

因篇幅问题不能全部显示,请点此查看更多更全内容