OEE计算表格
2022-01-13
来源:好走旅游网
铁材科冲床OEE计算序号1#冲床2#冲床3#冲床4#冲床5#冲床6#冲床7#冲床8#冲床9#冲床10#冲床操作人张明需恩见成军云爱意成元宝李虎马云比尔宋雨量夏雪净利用时间430430430430430430430430430430班次早早早早夜夜夜中中中停机时间作业时间2440638392124182140915415542528402164142440632398可利用率94.42%91.16%97.21%95.12%96.51%98.84%93.49%96.28%94.42%92.56%单件循环时间0.440.370.320.350.360.480.370.430.430.48说明:为了简化数据统计,从OEE计算过程中 可简化公式 =单件循环时间*良品/净计算总零件数700700700700700700700700700700性能效率76%67%54%61%61%79%64%73%75%84%合格698697696695694693692691690689质量率99.71%99.57%99.43%99.29%99.14%99.00%98.86%98.71%98.57%98.43%OEE71.1%60.4%52.3%57.3%57.9%77.7%59.3%69.6%69.6%76.8%71.1%60.4%52.3%57.3%57.9%77.7%59.3%69.6%69.6%76.8%2008-12-9制表65.2% =单件循环时间*良品/净利用时间