国际工程招标说明书格式(英文)

 

 

 

       INVITATION TO TENDER

        

      Whole Doc.

      Date:

      Tender No.

      1. The People''s Republic of China has-applied for a loan and creditfrom the World Bank towards the cost of ________________ Project. It isintended that part of the proceeds of this loan and credit will be appliedto eligiblepayment under various contracts for ____________ , __________,__________. Tendering is open to all tenderers from eligible sourcecountries as definedunder the "Guidelines for procurement" of the WorldBank.

      2. ___________ Company now invites sealed tenders from pre-qualifiedtenderers for provision of the necessary labour, materials, equipment andservices for the construction and completion of the project.

      3. Pre-qualified tenderers may obtain further information from, andinspect the tender documents at the office of: ________.

      4. A complete set of tender documents may be obtained by anypre-qualified tenderer for the cost of RMB _________ or US $ ___________on the submission of a written application to the above.

      5. All tenders must be accompanied by a Tender Security in anacceptable form and must be delivered to ________ Company at theabove-mentioned address (refer to Item 3) on or before ___________.

      6. Tenders will be opened in the presence of those tenderers''representatives who choose to attend at ____________ (time).

      7. If a prequalified foreign tenderer wishes to form Joint venturewith a domestic contractor, such a request will be considered if receivedwithin ______ days before the closing date for submission of tenders. Theselected local contractor shall be subject to approval by the Employer.

      8. The Pre-Tender Meeting will be held on __________ at the followingaddress: _________.

      

      Instructions to Tenderers

      

      

      General1. Description of Works (sketch)

      All tenderers shall have equal access for supply of domestic labourandmaterial.

      The Contractor shall make his own arrangements for the procurement oflocal labour, materials, transportation and other services.

      The Employer will assist Contractor in locating potential number ofsuppliers for local labour, materials. The Employer will also assist thecontractor in making his own arrangement for supply of fuel  andexplosives.2. Source of Funds

      2.1 The People''s Republic of China has applied for a loan and creditfrom the World Bank (hereinafter referred to as the IFI) towards the costof ____________ Project, and intends to apply a portion of the proceeds ofthe loan and credit to eligible payments under the Contract for whichthese documentsare issued. Payment by the IFI will be made only at therequest of the Chinese Government and upon approval by the IFI and will besubject in all respectsto the terms and conditions of the Loan Agreement.No party other than the People''s Republic of China shall derive any rightsfrom the Loan Agreement or haveany claim to the loan proceeds.

      2.2 Payment from the proceeds of the World Bank Loan will be limitedto goods produced in, and services supplied from, Switzerland and themember countries of the World Bank which have commercial relations withChina.

      2.3 All costs not met by the IFI Loan will be paid by the Employerfrom funds allocated by the Government of China.3. Eligibility and Qualification Requirements

      3.1 This tender is open to all pre-qualified tenderers from eligiblesource countries as defined under the "Guidelines for Procurement" of theworld Bank.

      3.2 All goods and services to be supplied under this Contract shallhave their origin in eligible source countries, and all expenditures madeunder the Contract will be limited to such goods and services.

      3.3 The origin of goods and services is distinct from the nationalityof the tenderer.

      3.4 To be eligible for award of contract, tenderers shall haveprovided evidence satisfactory to the Employer of their eligibility underclause 3.1 above, and of their capability and adequacy of resources toeffectivelycarry out the Contract. To this end, the Employer and____________ company may, at any time prior to award of contract, requesttenderers to amplifyor update previously submitted prequalification data.All Tenders submitted sha

    【正  文】include the following information:

      (a) copies of original documents defining the constitution or legalstatus, place of registration and principal place of business of thecompany, firm or partnership or, if a joint venture, of each party theretoconstituting the tenderer;

      (b) the qualifications and experience of key personnel proposed foradministration and execution of the Contract, both on and off site, in theformat prescribed in Schedule V;

      (c) major items of constructional plant and equipment proposed for usein carrying out the Contract in the format prescribed in Schedule IV;

      (d) a list of proposed sub-contractors in the format prescribed inSchedule VI;

      (e) information regarding any current litigation in which the tendereris involved;

      (f) the details of the construction methods proposed.

      3.5 For the purposes of sub-clause 3.4, tenderers who have beenpre-qualified may update and augment the information supplied with theirapplication for pre-qualification, and, in particular,  shall  giveparticularsof work in hand at the date of tendering.

      3.6 Tenders submitted by a joint venture of two or more firms aspartners shall comply with the following requirements:

      (a) the tender, and in case of a successful tender the Form ofAgreement, shall be signed so as to be legally binding on all partners;

      (b) one of the Joint Venture members shall be nominated as sponsor;andthis authorisation shall be evidenced by submitting a power ofattorneysigned by legally authorised signatories of all the members ofthe joint venture;

      (c) the joint venture sponsor shall be authorised to incur liabilitiesandreceive instructions for and on behalf of any and all members of thejoint venture and the entire execution of the Contract including paymentshall be done exclusively with the joint venture sponsor;

      (d) all members of the joint venture shall be liable jointly andseverally for the execution of the Contract in accordance with theContract terms, and a relevant statement to this effect shall be includedin the authorisation mentioned under (b) above as well as in the Form ofTender and the Form of Agreement (in case of a successful tender); and

      (e) a copy of the agreement entered into by the joint venture partnersshall be submitted with the tender.

      3.7 Domestic tenderers or combinations or joint ventures of domesticandforeign tenderers applying for eligibility for the application of a_____% margin of preference in the comparison of their tender with othertenders shall supply all information required to satisfy the criteria foreligibility as described in Clause 29 of these Instructions.4. Cost of Tendering

      The tenderer shall bear all costs associated with the preparation andsubmission of his tender and neither the Employer nor his  agent___________ Company will in any way be responsible or liable for thosecosts, regardless of the outcome of the tendering process.5. Site Visit

      5.1 The tenderer is advised to visit and examine the Site of the Worksandthe surroundings and to obtain for himself on his own responsibility,all information that may be necessary for preparing the tender andentering into a contract. The costs of visiting the site shall be at thetenderer''s own expense.

      5.2 Arrangements for a visit to site, including transportation andaccommodation. will be made by the Employer or his agent _________ Companyand will be advised to tenderers at the pre- tender meeting, details ofwhich are given in Clause 16 of these Instructions to Tenderers.,

      5.3 The tenderer and any of his representatives will be grantedpermission by the Employer or his agent ___________ company to enter uponits premises and lands for the purpose of such inspection by priorarrangement, but only upon the express condition that the tenderer and hisrepresentatives, will release and indemnify the Employer or his agent___________ Companyand its personnel from and against all liability inrespect thereof and willbe responsible for personal injury (whether fatalor otherwise), loss of or damage to property and any other loss, damage,costs and expenses however caused, which, but for the exercise of suchpermission, would not have arisen.

      

      Tender Documents6. Content of Tender Documents

      6.1 The set of documents issued to pre-qualified tenderers for thepurpose of tendering will cost RMB_______ or US $ ______ and will includethe stated number of copies of the following: Number of copies       Description 1    Volume 1       Instructions to Tenderers

      

      Conditions of Contract:

      

      Part I--General

      

      Part II--Conditions of Particular

      

      Application 1    Volume 2       Specification

      

      (incl. list of Drawings) 3    Volume 3       Form of Tender andAppendix thereto

      

      Form of Tender Security

      

      Bill of Quantities

      

      Schedules of Supplementary Information 1    Volume 4       Drawings

      6.2 Tender documents shall include any addenda issued prior to theclosing date of tenders in accordance with Clause 8 and any minutes ofpre-tender meetings issued in accordance with 