发布网友 发布时间:2022-04-23 00:57
共6个回答
热心网友 时间:2022-05-02 02:54
1, the business enterprise always invests 1,100,000 dollars RMB.(Rule outside company's investment can not less than USD 70,000, the share is more than 50%.)
2, the business enterprise practice share system and outside company's investment has share above 55%;Domestic investment the share have below 45%, domestic investment share from relevant three square press divide equally the share's property join from partnership.Each shareholder undertakes legal right and obligation according to the share, according to share allotment profits.
3, the business enterprise establish board of directors and supervisor meeting, board of directors and supervisor would of constitute is make sure by the business enterprise stand rule with legal power.
4, the business enterprise practice all a personnel to appoint to make, press appoint a post a top Gang a work and receive wages and enjoy a business enterprise to correspond treatment.The shareholder(natural person) then presses to appoint a post top Gang work and receives wages and enjoys a business enterprise to correspond treatment in the business enterprise last Gang;Don't work in the business enterprise last Gang of, then don't receive wages in the business enterprise with don't enjoy a business enterprise to correspond treatment.
5, the business enterprise conct scope
The development of electronics electric appliances(include to illuminate an electric appliances, high-tech electronics technique proct), proce sale.
6, the business enterprise be appointed a positive vice president, total engineer by the board of directors with related and main personnel.
7, the business enterprise conct strategy
1, first stage:With parts construction proce proct is lord, this stage is in the craft, equipments, personnel, society link up etc. graally attain mature, harmony.
2, second stage:In addition to continuing to proce a proct by parts construction, graally develop and proce an electronics town to flow machine plank by oneself, for the convenience of in exaltation proct quality, decline low cost, increment profits.
3, the third stage:Fight for becoming brand, and pass related attestation and ISO attestation.
4, the management place take lease as proper.
Eight, the business enterprise management plan
1, first stage(6 months):After pass by the construction manufacture on a trial basis, the in progress small scale proce.(attain to proce electronics economy energy a light 60,000 monthly)Graally build up is various regulation systems with perfect business enterprise.
2, second stage(6-10 months):I am large-scale to proce.(attain to proce electronics economy energy a light 100,000 monthly)
3, the third stage:Expand proct species and category, according to market need circumstance but settle.
2007
Discuss a cooperation September, prepare a work
Sign a cooperation to establish a business enterprise contract book October, draft to bid for a business enterprise document;Investigate a proct, technique, craft, equipments;Establish a board of directors, supervisor a meeting, make sure main management manager;Invest a funds to.
Lease a place November;Bid for a business enterprise;Invite a little amount framework personnel;(the wealth meeting, assistant, purchase, technique)Look for to provide goods a square a cooperation a colleague;The place presses the proction to request to in brief repair;The proct manufacture;Order an equipments;Draft a management document.
Prepare to host a business enterprise December;The proct manufactures already set on a trial basis, performance test, the small batch quantity proces material indent;Draft to proce a craft document.
2008
Install work to equip to have for 1-2 months, adjust to try movement;The job advertisement proces a personnel, establish a post job and work well an opening preparation.
Carry on a personnel training March, carry out a post job;Make to order a packing box, packing box;Try proction, manage with the stream water line, the small batch quantity proce(500), the proct is aging, tests, quality examination.
Adjust April perfect proce a craft, the batch quantity tries proction;(proce 10000 first for 15 days)The empress half month reproction is 10000.If be provided for goods quality to contain problem, then want to re- seek a cooperation a colleague and the batch quantity moves after proce.
Formally proce May, the month proces 30000.
Export the first goods June.
If go with a swing, plan can be 1-2 months in advance.I mainly is consider February is a Chinese New Year and there is some problems in the year ago opening:Have another some expenditures, the year ago recruit of the person have of New Year's Day behind may take place not to come, and then want to re- invite, training, but front of the person can't proce because of lacking Gang.
If the outside company doesn't raise of request, then can sign a cooperation to establish a business enterprise contract book in September, ordering an equipments and procing material October can try proction by batch quantity December.
热心网友 时间:2022-05-02 04:12
A total investment of 1.1 million yuan RMB. (Foreign investment of no less than 70,000 US dollars, shares more than 50%.)
2, the joint-stock enterprises, foreign investment accounted for over 55% of the shares; Domestic investment shares 45% below the shares of domestic investment by the three parties sharing the shares by investors to become shareholders. The shareholders claim borne by shares and debt, according to shares of the distribution of profits.
3, setting up the board and the board of supervisors, the board and the board of supervisors, composition and mandate charter determined by the enterprises.
4, enterprises all the personnel appointment, by appointment status or working for a wage and enterprises enjoy the same treatment. Shareholders (natural persons) in the provision of employment through enterprise employment status or working for a wage and enterprises enjoy the same treatment; Not taking up posts in enterprises, the enterprises do not receive wages and do not enjoy similar treatment to enterprises.
5, business scope
Electronic appliances (including lighting appliances, and high-tech electronic procts) for the development, proction and sales.
6, enterprises are hired by the board of directors, deputy general manager, chief engineer and related key personnel.
7, business strategy
1, the first phase : parts assembly and manufacture procts, the stage in the process, equipment, personnel, social convergence graally reach maturity and harmony.
2, the second phase : in addition to parts assembly and manufacture procts, the progressive development and manufacturing of electronic ballasts board, in order to enhance proct quality, rece costs and increase profits.
3, the third stage : for brands, and through related certification and ISO certification.
4, operating lease to the appropriate venue.
8, business plans
1, the first phase (six months) : After assembling Preparation, for small-scale proction (up to the monthly proction of electronic energy-saving lamps 60000). Graally establish and improve enterprise systems.
2, the second phase (6-10 months) : mass proction (per month and proction of electronic energy-saving lamps 100,000).
3, the third phase : expanding proct varieties and types, according to market demand conditions.
2007
September to discuss cooperation and preparation work
In October the creation of enterprises signed contracts, drafting bidding documents enterprises; Research procts, technologies, processes, equipment; The establishment of the board of supervisors and identify key management personnel; Investment funds become available.
November leased sites; Bid enterprises; Recruitment of a small core staff (finance, assistants, procurement, technology); Find suppliers partners; According to proction sites seeking a simple decoration; Trial proction; Ordering equipment; Drafting management documents.
December organize enterprises; Stereotypes trial proction, testing, proction of materials orders; Drafting document proction process.
2008
January-February tooling equipment installation, commissioning, operation; Proction personnel recruitment and formulate positions, and do a good job is ready to start.
March for the training of personnel, the implementation of their ties; Customized packaging boxes, cartons; Trial proction, balancing the pipeline, small volume (500), proct aging, testing, quality testing.
April adjust and improve proction technology and pilot proction quantities (15 days before procing 10,000); After months reproction 10000. If Availability quality issues, will have to find a partner, after the proction shift.
May formal proction, to proce 30,000.
In June the first batch of export goods.
If everything goes smoothly, plans to advance 1-2 months. My main concern is the Spring Festival in February, started some years ago : more spending bills before the New Year some people may not occur, but also to re-recruitment, training, and in front of people because they lack the post of proction.
If foreign investors do not demand better, they can be signed in September to establish corporate contracts, in October ordering equipment and materials for their proction in December can pilot proction quantities.
这个是我用翻译机翻译的(没骗人哦)
参考资料:http://www.hao123.com/ss/fy.htm
热心网友 时间:2022-05-02 05:47
A,the business enterprise always invests 1,100,000 dollar RMB.(Rule outside company's investment can not less than USD 70,000, the share is more than 50%.)
Two,the business enterprise practice share system, outside company the investment have share 55% above;Local investment share has 45% following, domestic investment share from concerning three squares the 资 joins from partnership by the share and share alike share.Each shareholder undertakes the legal right and obligation according to the share, according to the share allotment profits.
Three,the business enterprise establish the board of directors and the supervisor meeting, the board of directors and supervisor would of constitute is make sure by the business enterprise stand rule with legal power.
Four,the business enterprise practice all a personnel to appoint to make, pressing to appoint the post top 岗 work and receiving wages and enjoying a business enterprise to correspond treatment.Shareholder(natural person) the 岗 then presses to appoint a post top 岗 work and receives wages and enjoys a business enterprise to correspond treatment on the business enterprise;Not the 岗 work on the business enterprise of,then do not receive wages in the business enterprise with do not enjoy a business enterprise to correspond treatment.
Five,the business enterprise management scope
The development of the electronics electric appliances(include to illuminate an electric appliances,the high-tech electronics technique proct),proce sale.
Six,the business enterprise is appointed positive vice president,total engineer with related and main personnel by the board of directors.
Seven,the business enterprise management strategy
1,first stage:With the parts construction proce a proct is lord, this stage links up in the craft,equipments,personnel,society etc. attain graally mature,harmonious.
2,second stage:In addition to continuing to procing a proct by the parts construction to develop outside and graally and proce the electronics town to flow the machine plank by oneself, for the convenience of in exaltation the proct quality, decline low cost, increase profits.
3, the third stage:Fight for becoming brand, and pass the related attestation and ISO attestation.
4,the management place take lease as proper.
Eight,the business enterprise management plan
1,first stage(6 months):After pass by the construction manufacture on a trial basis, the in progress small scale proce.(attain to proce the electronics economy energy light 60,000s monthly)Build up graally with perfect business enterprise is various regulation systems.
2,second stage(6-10 months):Large-scale proce.(attain to proce the electronics economy energy light 100,000s monthly)
3, the third stage:Expand the proct species and category, settle according to the market need circumstance.
2007
Discuss a cooperation September, prepare a work
Sign a cooperation to establish the business enterprise contract book October, draft to bid for a business enterprise document;Investigate a proct,technique,craft,equipments;Establish a board of directors,supervisor a meeting, make sure main management manager;Invest a funds to.
Lease a place November;Bid for a business enterprise;Invite a little amount framework personnel;(the wealth meeting,assistant,purchase,technique)Look for to provide goods a square the cooperation the colleague;The place presses proction to request to repair in brief;The proct manufacture on a trial basis;Order an equipments;Draft the management document.
Prepare to host a business enterprise December;The proct manufactures already set on a trial basis, performance test, the small batch quantity proces the material indent;Draft to proce a craft document.
2008
Install work to equip to have for 1-2 months, adjust to try movement;The job advertisement proces a personnel, establishing the post job, working well an opening preparation.
Carry on a personnel a training March, implementation post job;Make to order the packing box,packing box;Try proction, manage with the stream the water line, the small batch quantity proce(500), the proct is aging,test,the quality examination.
Adjust April perfect proce a craft, the batch quantity tries proction;(proce 10000s first for 15 days)The empress half month reproction is 10000s.If be provided for the goods quality to have problems, then want to re- seek a cooperation a colleague, the batch quantity moves after proce.
Proce formally May, the month proces 30000s.
Export the first goods June.
If go with a swing, plan can be 1-2 months in advance.I mainly is consider February is a Chinese New Year, the year ago starts work some problems:Have another some expenditures, the year ago recruit of the person have of New Year's Day the empress may take place and come, and then want to re- invite,training, but the anterior person can't proce because of lacking 岗 .
If outside the company raise of request, then can sign a cooperation to establish the business enterprise contract book in September, order an equipments and proce material and can try proction by batch quantity December October
用GOOGLE翻的..
热心网友 时间:2022-05-02 07:38
人工我英语还不行~~建议还是你去找个真人来翻译~~质量有保证~~
在网络找人翻译比较重要的文件是很危险的!
热心网友 时间:2022-05-02 09:46
First, enterprise total investment 1.1 million Yuan RMB. (Stipulationforeign merchant investment does not have to be short to 70,000 USdollars, stock is bigger than 50%.)
Second, the enterprise practices the joint stock system, the foreigninvestment accounts for above stock 55%; The domestic investment stockaccounts for below 45%, the domestic investment stock by relatedtripartite according to divides equally the stock investment buystock. Various shareholders undertake the creditor's rights and thedebt according to the stock, according to stock assignment profit.
Third, the enterprise had been established the board of directors andthe board of supervisors, the board of directors and board ofsupervisors's composition and the jurisdiction determined by theenterprise regulation.
Fourth, the enterprise implements the whole personnel to appoint thesystem, according to appoints the post to post the work, receives thewages and enjoys the enterprise corresponding treatment. Theshareholder (natural person) posts in the enterprise presses appointsthe post to post the work, receives the wages and enjoys theenterprise corresponding treatment; Does not post in the enterprisethe work, does not receive the wages in the enterprise and does notenjoy the enterprise corresponding treatment.
Fifth, enterprise management scope
Electronic electric appliance (including illumination electricappliance, high tech electronic technology proct) development,proction sale.
Sixth, the enterprise invites deputy general manager, chief engineerand the correlation key personnel by the board of directors.
Seventh, the enterprise manages the strategy
1st, first stage: By the part assembly proction proctprimarily, this stage in the craft, the equipment, the personnel, thesociety links up and so on the aspect graally achieved mature, isharmonious.
2nd, second stage: Besides continues by the part assembly proctionproct, graally develops and voluntarily proces the electronicballast board, favor improves the proct quality, reces the cost,the increase profit.
3rd, third stage: Strives for into the brand, and through correlationauthentication and ISO authentication.
4th, manages the location take to rent as is suitable.
Eighth, the enterprise manages the plan
1st, first stage (6 months): After the assembly trialmanufacturing, carries on the small-scale proction (to achieve eachmonth of proction electron energy conservation lamp 60,000).Graally establishes and the consummation enterprise each rules andregulations.
2nd, second stage (6 - 10 months): The large scale proction(achieves each month of proction electron energy conservation lamp100,000).
3rd, third stage: The expansion proct variety and the category,decide according to the market demand situation.
In 2007
In September discusses the cooperation, the preparatory work
In October signs the cooperation foundation enterprisecontract, the draft application enterprise document; Investigation andstudy proct, technology, craft, equipment; Tenable board ofdirectors, board of supervisors, determination main managementadministrative personnel; The investment fund arrives.
In November rents the location; Application enterprise; Advertises forthe few backbone cabal (finance and accounting, assistant, purchase,technology); Seeks the supplier partner; The location simply repairsaccording to the proction request; Proct trial manufacturing;Orders the equipment; Draft management document.
In December prepares the enterprise; The proct trial manufacturingfinalizes, performance test, small volume proction materialordering; Draft proction technological document.
In 2008
1 - in February installs the work clothes equipment, thedebugging movement; The employment advertise proction personnel, themaking post responsibility, prepares for begins.
In March carries on the personnel to train, realization postresponsibility; Custom make packing box, packing case; Tries toproce, straightens out the assembly line, the small volumeproction (500), the proct gets older, the test, the qualityexamination.
In April adjusts consummates the proction craft, the batch tries toproce (15 day first to proce 10,000); The latter half a monthreproces 10,000. If supplies goods the quality to have the question,then must relook for the partner, after the volume proction moves.
In May the official proction, the month proces 30,000.
In June exports first 批货.
If progresses smoothly, the plan may ahead of time 1 - 2 months. Imainly am considered February is the Spring Festival, the year agobegins some questions: Many some expenditures, after the year ago amove of person has the new year's celebration possibly could notoccur, also had reto advertise for, training, but front person becauselacked the hillock to be unable to proce.
If the foreign merchant does not enhance request, then may inSeptember sign the cooperation foundation enterprise contract, inOctober orders the equipment and proction material in December maythe batch try to proce.
一定对!
热心网友 时间:2022-05-02 12:11
An enterprise RMB total investment of 1.1 million yuan. (Regulation of foreign investment should not be less than 70,000 US dollars, the shares more than 50%.)
2, joint-stock enterprises, foreign investment accounted for more than 55% of the shares; Domestic investment accounted for 45% of the shares, the shares of domestic investment by the three parties sharing the shares by investors shares. Bear shares by the shareholders and creditors of debt, according to the distribution of profits shares.
3, enterprises and the establishment of the board of supervisors board, the composition of the board and board of supervisors and authority established by the statutes.
4, enterprises of all personnel appointment system, by appointment status through work, receive wages and enjoy similar treatment to enterprises. Shareholders (natural) in the enterprise through the appointment of posts according to their posts, receive wages and enjoy similar treatment to enterprises; Not working through enterprises, the enterprises do not receive wages and enterprises do not enjoy similar treatment.
5, business scope
Electronic appliances (including lighting appliances, high-tech electronics procts) the development, proction or sales.
6, enterprises are hired by the board of directors, deputy general manager, chief engineer and related key personnel.
7, business strategy
1, the first stage: parts assembly and manufacture procts, in the present stage of technology, equipment, personnel, and other aspects of social convergence graally mature and harmonious.
2, the second phase: in addition to the parts assembly and manufacture procts, and graally developed its own proction of electronic ballasts plate, so improving the quality of procts, rece costs and increase profits.
3, the third stage: to become a brand, and through the relevant certification and ISO certification.
4, operating lease to the appropriate venue.
8, business plans
1, the first phase (six months): After assembling Manufacture, small - to medium-scale proction (up to the monthly proction of electronic energy-saving lights 60000). And graally establish and improve enterprise systems.
2, the second phase (6-10 months): mass proction (up to the monthly proction of electronic energy saving lamps 100,000).
3, the third phase: expanding proct varieties and types, according to the market demand conditions.
2007
September to discuss cooperation and preparation work
October signed cooperation contracts creation of enterprises, enterprises drafting bid documents; Research procts, technologies, techniques, equipment; The establishment of the board, the board of supervisors, identify key management personnel; Investment funds are available.
November rented venues; Bid enterprises; Recruitment of a small skeleton staff (accounting assistant, procurement, technology); Availability for the partnership; According to the proction site requirements simple decoration; Proct Manufacture; Ordering equipment; Drafting management documents.
December organize enterprises; Manufacture procts stereotypes, performance testing, proction of small orders; Drafting document proction process.
2008
January-February Tooling equipment installation, commissioning operation; Recruitment of personnel to formulate ty, ready to start.
March personnel training, implementation of ty; Customized boxes and boxes; Pilot proction, streamline the pipeline, small volume (500), proct aging, testing, quality inspection.
April adjustment and perfection of the proction process, pilot proction quantities (15 days before procing 10,000); After months of reproction 10000. If Availability quality problems, they have to find new partners, shift after proction.
May formal proction, to proce 30,000.
In June the first batch of export goods.
If everything goes smoothly, can be 1-2 months in advance. My main consideration is the Spring Festival in February, started some years ago: more spending bills before the New Year some people may not occur, but also to the recruitment, training, and in front of people because not lacking Kong proction.
If foreign investors do not increase the requirements, they can build enterprise cooperation signed in September contract, in October ordering equipment and materials proction quantities in December to pilot proction.